- Once your pool liner has been ordered, we will communicate with the manufacturer to obtain a delivery date. This will allow us to schedule your install date.
- Once our engineers are on-site, we generally allow two visits for the pool liner installation. The first visit consists of removing the old liner and preparing the pool for the new liner. Once the new liner is installed, the pool can be left filling up. The second visit consists of the engineers returning to the site to cut in the internal pool fittings.
- Depending on the size of your pool and water facilities we can in some circumstances complete a full liner install in one visit.
- Our engineers have fully equipped vans with the necessary equipment needed to install your pool liner. We are also able to accommodate water drainage and water storage facilities.